Mainland Gas Fired Steam Boiler

Mainland Gas Fired Steam Boiler

1 electric mainland fired steam boiler maintenance, maintenance when the boiler must be cut off and must relief. 2, the burner every two months to be removed from the boiler, carefully remove foreign bodies such as dust and soot. Photocell light-receiving surface wipe once a month, fuel filter should always be kept clean and filtering capabilities; carefully clean the filter in the pump, do not break the seal. Oil-burner not idle, so as not to damage the pump. 3, the water level gauge should always be kept clean, rinse the purge valve is opened, the water level in order to ensure a clear day. 4, pulling the safety valve once a day, to prevent rusting failure. 5, the boiler stops longer running time, cut off the power, and do maintenance work: (1), dry maintenance, shutdown after the release came out water, dirt clean the furnace, slow fire the pot with a burner after drying (burn time not too long, to avoid damage to the boiler), then drain all of the gas boiler, all pipe valve closed, checked every three months. (2), wet maintenance for a period not exceeding one month shutdown of the boiler, furnace shutdown after water release, discharge and clean fill with water, cut off the power, close the valve.

Food is food industry is human life industry, but also an ancient and eternal evergreen industry. Industrial mainland fired steam boiler as an integral part of the chain, is mainly used for processing of distillation, extraction, sterilizing, drying, curing and other processes. Anqing City, Anhui Province is located in the Want Want Foods Co., Ltd. mainly engaged in all kinds of puffed food processing and manufacturing and sale of steam boiler steam delivered directly or indirectly in contact with food, thus requiring the steam quality is very high. Due to expanding production needs, Want Want Foods in urgent need of a boiler plant to provide high-quality steam. After a comprehensive understanding of the boiler industry, determined to cooperate with the fast boiler. Want fast square perennial cooperation with the country's food company, it has considerable experience of cooperation. By understanding the needs of the Want Want food production, providing a whole 10 tons of steam condensing gas steam boiler (WNS10-1.25-Y.Q).

Henan newly installed gas boiler 1 what kind of work before starting. Henan newly installed gas boiler before starting what should be done? These include: the tightness of (1) hydrostatic test (overpressure test), test pressure member. (2) Trial and various auxiliary electric door damper check. (3) oven. Water inside wall of the furnace and gas water boiler tubes Henan removed. (4) cooking stove and pickling. Remove grease deposits in the evaporator heating surface system, rust, oxide scale and corrosion products, and other like with lye and acid. (5) furnace aerodynamic field test. (6) flushing pipe. Henan boiler with gas flushing a self-generated steam, the second steam duct heteroaryl residue. (7) check security doors. 2. Henan gas boiler before start time and temperature of water on what regulations? why? Water speed before the start of Henan gas boiler should not be excessive, winter generally less than 4h, other seasons 2 ~ 3h, especially in the beginning of the water should be slow. Cold boiler water temperature is generally not more than 100 ℃, so that the temperature difference between the feedwater entering the drum drum wall temperature is not more than 40 ℃. Henan not completely cooled gas boiler drum water temperature, mutatis mutandis, wall temperatures, generally the difference should be controlled within 40 ℃, it should slow down or speed water. The reasons are: (1) Since the thick-walled drum, slow expansion, the wall of the tube is connected to the drum wall is thin, expanded rapidly. If the inlet water temperature is too high or too fast, uneven expansion will cause the weld cracks occur, resulting in damage to the equipment. (2) when the water supply enters the drum, the drum is always in contact with the first half wall, if the water temperature and the drum wall temperature difference is too large, the influent fast speed, on the drum, the lower wall, the inner and outer wall inter will have a greater expansion difference, caused a large drum to additional stress, causing deformation of the drum, when severe cracks.

The frequent attacks on haze weather since last year heralded that the atmosphere had to be managed. Coal emissions are regarded as the culprit of the formation of haze, so the coal-to-gas plan has entered a high-speed growth period in an all-round way. At present, the transformation of natural gas boiler has become the hot first choice for investment environment management industry. According to reporters understand, so far for coal-fired boiler demolition and phase-out has entered a substantive phase of implementation. Since entering the second quarter, many places in the country have issued measures to remove and reform high-pollution coal-fired boilers, and a war of annihilation of coal-fired boilers has been launched in an all-round way. The correlation analysis shows that under the background of energy saving and environmental protection, coal to gas will become the next few years. As a substitute for coal-fired boilers, natural gas boilers will also usher in a high-speed growth period. In addition, the reporter learned that since the second quarter of 2013, in addition to Beijing, Zhengzhou, Xi'an has also dismantled 194 coal-fired boilers; Construction, environmental protection, municipal and other departments of Lanzhou City to reform the urban coal-fired boiler projects jointly approved, has started to demolish 83 units of 1518 steam tons, accounting for 40% of the total task of dismantling; Urumqi, Xinjiang, has put coal into the people's livelihood project as the top priority in the construction of beautiful Xinjiang; dozens of heating stations in Tibet are also actively carrying out the transformation of gas-fired boilers; Jiangsu Jiangyin, which is heavily energy-consuming, has also stepped into clean-energy applications, with 100 coal-fired boilers scheduled to be phased out by the end of the year. As a result, the coal-fired boiler gas conversion project has entered the high tide period.

Free Chat

About Us

Contact Us