700 Bhp Electric Hot Water Boiler Seller

700 Bhp Electric Hot Water Boiler Seller

Use small electric steam 700 bhp electric hot water boiler seller steam boiler electric steam boiler steam boiler using a small electric steam boiler electric steam boiler manufacturer boiler Class A: Yongxing boiler - designated national, A-level qualifications, professional supplier of electric steam boilers, gas boilers, coal-fired steam boilers, biomass steam boiler. Kinds of environmental protection steam boiler. Factory Scope of supply: all regions of the country and Southeast Asia. Boiler types: electric boilers, electric steam boilers. Supply and installation of: direct factory boiler, installation, commissioning and after-sales service can directly call or message advice. What are the advantages of small electric steam boilers that? One. When the electric steam boiler leak hazard, the boiler controller automatically cut off power supply to avoid electrical shock. 2. Automatic water supply function: When the water in the boiler is lower than the safety level, the automatic stop heating the heating tube to prevent damage caused by dry combustion and ignites the indicator water; III. Typically, cable is connected between the ground and well grounded. When the boiler steam pressure exceeds a set limit pressure relief valve start and release the steam to reduce the pressure. four. Overcurrent protection: When the boiler overload (high pressure), earth leakage circuit breaker is automatically disconnected. 5. Power Protection: use of advanced electronic circuit detects over-voltage fault condition, undervoltage, reliable power failure protection. 6. The vapor pressure of the small electric steam boiler with a variety of specifications, the power of the select electric steam boiler; 7. Electric steam boiler is electric energy, no noise, no pollution, no emissions of environmental protection products. 8. A steam boiler is heated by a small electric power control, ease of installation and matching, large boiler (500Kg) of the furnace is prevented and the control electronics electronic control portion of the furnace affected. High temperatures, to ensure stable operation. 9. The boiler temperature by automatic control cabinet. Insulation and electric heating control technology, the thermal efficiency of 97%. ten. Boiler advanced electrical controller having a computer boiler reliable performance, high degree of automation, easy operation. Using the electrical components to ensure high quality of production. Life products. Small electric heating steam boiler 1. The boiler performance characteristics of the boiler furnace using steel pressure vessel, the longitudinal and circumferential weld furnace automatic welding, and X-ray detection. Small furnace and electrical integration, easy installation. 2. The JB / 2379-93 standards and technical requirements of the metal pipe heating element, a low load heating surface of the heating element. Thick stainless steel high electric wire outer tube, the inner tube is filled with the high purity magnesium oxide, electrically heated tubes and long service life. Each heating element has a flange, simple structure, high mechanical strength, safety and reliability, can be replaced. 3. Compact, scientific and rational design, advanced manufacturing technology enables the boiler space is small, easy to transport, saving the use of space. four. Intelligent automatic control technology, without duty. Flexible and can be set to manual or automatic mode. 5. Set the boiler automatic operation time period, day provided several different duty cycles, the boiler is heated in each group sharing start automatically cut off the heating cycle and into the group. Contacting all use the same frequency and time, improve the life of the device. control. Seven. Full protection, leakage protection, water protection, ground fault protection, steam overvoltage protection, overcurrent protection, power protection, the boiler automatic protection, security. Full home. 8. No noise, no pollution, high thermal efficiency. High quality and efficient boiler heat insulation materials, low heat dissipation, energy saving. 9. Boiler packaging design using well-known color plate, elegant appearance, easy to rust. Small electric steam boiler - Boiler power plant with procurement requirements.

Gas-fired 700 bhp electric hot water boiler seller, fuel gas-fired boiler, fuel gas hot water boiler, steam boiler fuel: gas boiler includes a gas water boiler, gas hot water boiler, gas steam boilers, gas hot water boiler which is also known as gas heating boilers and gas boilers bath, gas as the name suggests refers to the boiler fuel for the gas boilers, gas boilers and oil-fired boiler, electric boiler compared to the most economical, most people have opted for a gas boiler as steam, heating, boiler equipment for bathing. Gas boiler comprising KS-Q water gas boiler, CLHS (CWNS) gas hot water boiler, LHS (WNS) gas steam boiler and the like, wherein the gas comprises a gas hot water boiler heating boilers and gas boilers bath, with the state "natural gas "project implementation, gas boiler gradually become the people's choice.

First, before regularly shutting down 700 bhp electric hot water boiler sellers and inspecting electric furnaces, the following three aspects of preparation should be done: The main contents are as follows: (1) consult the technical file of boiler retrofit electric furnace registration and understand the use of boiler retrofit electric furnace. In order to make the boiler reform electric furnace inside and outside inspection, the general need to know: boiler transformation electric furnace design, manufacturing, installation situation; boiler transformation electric furnace transformation situation; boiler transformation electric furnace operation history and use situation; Boiler retrofit electric furnace water treatment, boiler rules and regulations implementation, and so on.

2) the preparation for stopping the furnace before inspection. First, according to the maintenance schedule, the furnace shutdown date is arranged, and then the boiler revamping electric furnace is shut down according to the normal shut-down procedure, so that the furnace is slowly frustrated. The cooling method can be adopted by injecting gas to dissipate the sinking water, replacing the furnace water for cooling, and cooling by ventilation in the in-line furnace. When the temperature of the furnace water drops to 70 ℃ 80 ℃, the water can be discharged. Open all the doors. When opening the door hole, prevent warm water, steam suddenly spurts out to burn people. The steam, feed water and sewage pipes in the furnace are separated from the corresponding pipes in the boiler revamping furnace in operation. The baffle used for partition should be strong enough to avoid being bulged out by high pressure media. Break position Clear instructions should be given. The flue which is connected with other boiler revamping electric furnaces should also be reliably separated. In addition, it is necessary to remove the soot and scale on the heating surface of the boiler retrofit electric furnace.

3) preparation of inspection tools and lighting. In order to ensure smooth inspection work, inspectors should prepare the necessary instruments, tools, gauges and safe and reliable lighting.

According to instructions, "Neijiang City in 2017 and phase out coal-fired 700 bhp electric hot water boiler seller desulphurization facilities construction program of work", before the end of this year, the city built-up area will be fully phased out in Neijiang City, 10 steam tons / hour of coal-fired boilers and a total of 46 units. Among them, a small city in district out of coal-fired boilers 26, and phase out coal-fired small boilers Dongxing District 15, Neijiang Economic Development Zone small coal-fired boilers out of five. At the same time, accomplish four Chuansha Qi Industrial Co., Ltd. Two 20 tons of steam / hour or more coal-fired boiler desulphurization facilities. A ban on new urban area 20 steam tons / hour of coal-fired boilers, other counties (cities, districts) in principle, the new 10 steam tons / hour of coal-fired boilers. Out of the way including demolition scrap, coal to gas, coal and electricity upgrade boiler swap with large capacity.

We understand that the new Neijiang 20 tons of steam / hour for coal-fired boilers built-up areas, the new 10 steam tons / hour or less fixed asset investment projects in other areas of development and reform, economic and information technology departments will not be approved, approval and filing, environmental protection departments at all levels shall not pass environmental impact assessment, quality supervision departments at all levels do not accept the installation told not arrange supervision and inspection, no special equipment issued registration certificate. Quality supervision departments at all levels cancellation of special equipment for the boiler has been out of use registration certificate to prohibit the production of boiler manufacturers boiler does not meet industrial policy.

Free Chat

About Us

Contact Us