At the end of 2017, China Guodian is located in Jiangxi Province Wanan Hydropower Plant After evaluating the situation, some of the steam 4 tph fired boiler used to purchase much-needed daily work. Sales Manager fast boiler combined with the actual situation of the power plant for its recommendation 2 0.5 tons of electrically heated steam boilers.

Prevent explosion of the furnace, the fuel (gas) 4 tph fired boiler flame protection means must be provided, is a function of combustion (including ignition, combustion or misfires when halfway off, typically within five seconds re-ignition furnace in the monitoring, within 1 second running off into the oil (gas) solenoid valve, and turns on and audible alarm signal, when the blower continues to operate, the residual gas was purged of combustible furnace, after 20 to 30 seconds purge, automatically cut off the blower and various auxiliary power boiler stop running.) by the flame monitoring and control device component. Role is to monitor the flame control device signals the presence of a flame or interrupted.

Burner output should match the rated output of the 4 tph fired boiler, choose a good shape of the flame, such as length and diameter so as to adapt the furnace structure. The required combustion air is supplied from the root flare fuel gas and air or oil mist uniformly mixed rapidly, to ensure complete combustion.

flameout state and treatment method of oil-fired 4 tph fired boiler

The customer asked: what is the status of the fuel-fired boiler after it is put out? How to judge whether the burning oil and gas boiler is extinguished?