Horizontal 0 5 Ton Biogas Boiler

Horizontal 0 5 Ton Biogas Boiler

Major scientific and technological innovation is the State of the weighing, State of the weapon must be firmly in their hands, we must rely on self-reliance and independent innovation. - Xi Jinping December 14, kicked off at the Third International Fair of Innovation and Entrepreneurship Center at the National Convention. As China's first international "double hit" Expo theme show to the world maker culture: power generation, focusing on innovation! Fast Boiler Co., Ltd., Henan Province, to participate as an outstanding representative of the exhibition, at the provincial delegation of the booth, the party fast low nitrogen product model horizontal 0 5 ton bioboiler and remote monitoring system is placed at the front, leaders at all levels attach great importance to the domestic foreign passengers .

How to industrial horizontal 0 5 ton bioboilers for energy saving? After the founding of new China booming up rapidly, widely used in the industrial sector. Professional cycle plant can achieve industrial boilers of thermoelectric energy transfer, increase the maximum temperature, to facilitate performance of power generation or supply. China has been in the industrial boiler production and use of multi-national self-sufficiency since the sales model also gave me too industrial development provides a lot of convenience.

Hot water horizontal 0 5 ton bioboiler, the boiler should be installed in the three-phase four-wire power supply system: a necessary condition for electric water boiler 1, the boiler should be installed in a three-phase four-wire power supply system, the mounting surface should be smooth and without any surrounding explosive article; ground wire must be installed and ensure reliable connection. 2, boiler and piping circuit should be installed, the quality of the installation must comply with the relevant provisions of national industries. 3, the operator must be specially trained in advance, basic knowledge and operating procedures of the boiler should be aware of. 4, the boiler operation, boiler feed water tank must be, and must be qualified through softened water. 5, the power supply should be used to install the boiler control switch, the capacity of the power supply must be rated for the voltage and the electrical power needed to run the boiler. 6, check that the boiler and the piping circuit installed correctly, all valves and switches without exception, and that the water circuit remains normal. Third, the furnace power line specification table 50007 100,015 million million million 200,030 1,200,000 400,060 million single set of heating tube power 15KW / 24KW group / group 24KW / 24KW group / group 24KW / 24KW group / groups 24KW / group 24KW / 24KW heater tube assembly group number / group 43.5581015203060 power load hot 61010101010101010 three-core cable mm? 355075951502X952X1853X1856X185

Note sootblowing manually horizontal 0 5 ton bioboiler (1) to ensure the security, acetylene cylinders must be placed in designated locations, lock, and prevents loss of pressure valve member; (2) solenoid valve according to a switching operation time must be designed for a given time, timeout is prohibited; (3) follow the operation procedures; and (4) when the pressure of acetylene below the allowable value, the cylinder should be replaced; (5) the case of boiler fouling, sootblowing a class can begin to gradually reduce to-day once; (6) open timing of a hydrophobic, water and remove the inner tube.

Free Chat

About Us

Contact Us