Pressure fire operations and precautions Henan fast boiler's best selling steam boiler Xiao Bian told you about the operation of steam boilers and pressure fire precautions and stainless steel high temperature magnetic pump structural characteristics 1. pressure steam boiler fire steps of (1) to reduce boiler load, according to the length of time of shutdown, the seam thicker, the thickness is generally not more than 200 mm, suitable to accelerate the speed of the grate. (2) to the slag is thickened seam about 1 mm from the stop grate rotation, the drum is stopped, the operation of the induced draft fan, blowing off a small segment of the regulating plate stopper and dampers qs, relying on natural ventilation to maintain coal the lean-burn, the sewage, boiler water level will rise to the maximum allowable level. If the fire burn coal gate, grate can be switched on again, the coal-fired back, a distance. (3) the recovery boiler needs to run, as long as the opening lead, a blower, to adjust the smoke, and the wind baffle plenum segment adjusting the opening degree of the shutter, the adjustment of combustion steam boiler seam thickness to be normal, start grate, can be restored run. 2. Note the use of a steam boiler (1) before starting Check power supply voltage, there are unusual circumstances water, close the drain valve opens the water supply valve, check whether the pump stuck, stuck if the pump, remove the fan cover, rotation of the motor shaft to the flexible state to boot. (2) When the steam boiler maintenance or replacement of parts, turn off the power to avoid live work dangerous. (3) electronic control box, pump motors and other parts should avoid damp water to prevent burning boiler should pay attention to keep clean. (4) steam boilers in accordance with quality requirements, when using the apparatus sure to install a water softener, the water softener is not used because the boiler may cause fouling, may cause serious squib, shortening the life of the boiler. (5) Please note that when using sewage. And at least once a day with a discharge pressure of between 0.1MPa to 0.15MPa discharge may be prevented clogging of pipes, sewage should be properly connected, to guard against burns. Stainless steel high temperature magnetic pump structural features: a sliding bearing magnetic pump sliding bearing materials impregnated graphite, PTFE and engineering ceramics. Because of engineering ceramics has good heat resistance, corrosion resistance, abrasion performance, so the sliding bearing magnetic pump more use of engineering ceramics production. Because of engineering ceramics are brittle and expansion coefficient, so the bearing clearance is not too small, so as not to hold the shaft accident. Since the magnetic pump in order to lubricate sliding bearing medium conveyed, it should be used depending on the medium and conditions, making use of different materials bearing. 2. Cooling lubricating fluid flow control pump operation must be flush cooling internal friction annulus region between the sliding bearing and the magnetic rotor and the containment shell with a small amount of liquid. Coolant flow rate is typically 2-3% of the design flow of the pump, the annulus area between the inner magnetic rotor of the eddy current generated spacer bush high heat. When enough cooling lubricant or flushing holes poor, clogging, the medium will result in a temperature above the operating temperature of the permanent magnet, the inner magnetic rotor gradually loses its magnetism, the magnetic force actuator failure. When the medium is water or water-based liquid, the temperature rise can be maintained in the annulus region of 3-5 deg.] C; or when the medium is a hydrocarbon oil, allows the annulus region of the temperature was maintained at 5-8 ℃. Henan is committed to fast boiler steam boiler manufacturing, product quality, reasonable prices and widespread industry praise, if you have any needs, please contact us!

After electric best selling steam boiler shutdown, how to carry out maintenance in the long-term disabled electric steam boiler, furnace should pay great attention to external corrosion and maintenance problems. First, after power shutdown cooling steam boiler, the ash must be thoroughly cleaned and the heating surface fouling the upper grate, the lower portion of the furnace. Then to maintain a certain degree of natural ventilation flue. In general, in order desiccant moisture should be placed in the furnace, flue. The quicklime as a drying agent, within the furnace or flue gas per cubic meter should be placed generally about 3kg. After placing all the ventilation should be tightly closed doors. After the change of lime powder to be replaced. Low-lying position as boiler room, ground during shutdown severe flood tide, often approach should be used and placed a small fire to dry desiccant combination. If the boiler shutdown a long time, after the complete removal of soot coated with an anti-corrosion red lead paint in oil or other metal surface furnace. As for anti-corrosion maintenance methods inside the furnace shutdown, the shutdown Yaoan the length of time to be. In general, no more than one month shutdown maintenance wet available, more than one month should be taken to maintain dry. To note the following problems when a dry maintenance: desiccant boiler not in direct contact with the metal surface, may be mounted in a container such as the iron plate after the desiccant is placed, and a hole for shutting the other hand hole cover, valve steam, the water pipe change must cut lime powder should be replaced.

Use should pay attention to the problem of best selling steam boiler pressure gauge. Rated steam pressure of less than 2.45MPa steam boiler, a manometer accuracy no less than 2.5; equal to the rated boiler steam pressure 2.45MPa, the pressure is not less than 1.5. Dial gauge diameter of not less than 100 mm, to ensure that the operator can clearly see the surface pressure indication. 2. Steam boiler gauge plate should draw a red line that indicates the maximum allowable working pressure. 3. The steam boiler pressure gauge should be installed in place to facilitate the observation and purged, and should prevent high temperature, vibration and icing. 4. The steam boiler pressure gauge should be checked at least once every six months, after calibration seal should be sealed. 5. The steam boiler gauge connection tube not leak water and steam, otherwise it will reduce the pressure instruction value. Biomass boiler is a kind of boiler to biomass energy as a boiler fuel called biomass boilers, steam boilers into biomass, biomass hot water boiler, biomass stove, biomass thermal oil heaters, vertical raw biomass boilers, biomass boilers and other horizontal. Steam boiler is an energy conversion device, the energy input to the boiler fuel chemical energy, electrical energy, thermal energy and other forms of high temperature flue gas, and after converting the boiler, the steam output having a certain outside thermal energy, high-temperature hot water or an organic carrier. 6. A steam boiler pressure gauge measuring range should be compatible with the operating pressure of the device under test, the working pressure is generally 1.53 times, preferably 2 times the working pressure. Steam boiler no pressure gauge, pressure gauge or pressure gauge damage does not meet the requirements. When the steam boiler pressure gauge of the following circumstances, should stop using: 1, the surface of the glass broken or blurred dial; 2, lead-free seal, lead seal is broken or exceeds the calibration cycle; 3. When no pressure gauge pointer position is limited to the limit staple nail can not be restored, and the unlimited gauge pointer from zero rank bit data is out of range pressure layer. Difference; 4, leak or pointer jump table; 5, other defects affect the gauge accuracy.

In order to promote technological progress and sustainable development, improve environmental quality and protect public health, recently, the Liaoning Provincial People's Government of air pollutants for coal-fired power plants developed specific criteria (hereinafter referred to as the "standard"). This is the first time a set of policies Liaoning Province for air pollutant coal power plant.

"Standard" provides for pollutant discharge limits, surveillance and monitoring requirements within the jurisdiction of coal-fired power plant in Liaoning Province atmospheric and fugitive emissions control requirements. Since the implementation of the standards, air pollutant emissions coal-fired power plants all within the jurisdiction of Liaoning Province will be executed in accordance with the provisions of this standard.

2, since January 1, 2019, the emission limits of existing single output and more than 300MW generating units supporting the provision of a coal-fired power generation boilers execution table.

3, since 1 December 2020, the emission limits of existing single output 300MW generating units supporting the coal-fired power generation boilers and other power boilers as specified in Table 1 execution.

Sampling the exhaust gas (1) power plant, to be carried out in a predetermined position in accordance with the type of monitor emissions monitoring contaminants. In the discharge of pollutants should be set up to monitor the position of long-term monitoring holes, sampling platform and related facilities. When the sampling platform height from the ground greater than 40m, should be set by a lift platforms, lifts or other convenient and safe facilities. No elevator or elevator building coal-fired power plants, when the sampling platform height from the ground greater than 20m, should be set up safe, convenient electric monitoring equipment hoisting facilities.

Composition structure (3) continuous monitoring system atmospheric pollutants, technical requirements, test items, test methods and installation, commissioning, acceptance, operation management, data processing, etc. according to the provisions of HJ75 and HJ76.

(5) continuous monitoring system meter of air pollutants detection sensitivity, detection limit, and should meet the range of low concentrations of pollutant emission monitoring technical requirements, the concentration of nitrogen oxides include nitric oxide (NO) and nitrogen dioxide (of NO2), Determination of nitric oxide only has the ability to configure the analytical device of nitrogen oxides NO2 / NO converter.

(7) for coal-fired power boiler emissions of air pollutants sampling monitoring, sampling frequency, the sampling time and the operating load requirements,, HJ / T397 and related predetermined low exhaust gas concentration monitoring is performed according to specifications GB / T16157.

(9) shall be in accordance with the provisions of the enterprise "Environmental Monitoring and Management Measures" and the HJ819, HJ820 requirements of pollutant emissions and its impact on environmental quality around to conduct their own surveillance, monitoring and save the original records, public information.

Determination of air pollutants fired power plant analysis are shown in Table 2. After the release of the present embodiment national standard method of monitoring criteria pollutants, such as applicability to meet the requirements, the same applies to the determination of the corresponding standard contaminants present.

2, responsible for overseeing the management of this standard by the executive authorities and the standardization of administrative departments above the county level environmental protection. The results of the environmental protection departments at all levels and other relevant units in the enterprise supervision and checks can be instantly sampled or monitored the scene as determining whether acts of sewage meet emissions standards based on the relevant environmental protection and the implementation of management measures.