Hot Sale Natural Gas Water Boiler

Hot Sale Natural Gas Water Boiler

Furnace pulverized coal fired boiler is smaller than you: Today saw a piece of content, said: with the same capacity, oil-fired boiler furnace is smaller than pulverized coal. why? The following reasons: the size of the furnace volume, in the boiler capacity is determined, depending on the size of the volume of heat load. Volumetric heat load size is mainly determined by the type of fuel. After the fuel into the furnace, it will take some time to burn. Typically all the required fuel burn before leaving the furnace, the pulverized coal burnout is obviously longer than oil, i.e. coal flame longer than oil. To ensure long-term safe operation of the boiler, not only to prevent the boiler slag, and flue gas at the furnace exit is low to make the temperature at the start of the deformation ratio of ash flue gas temperature 50 ~ 100 ℃, at the outlet of the furnace and to prevent subsequent convection slagging heating surface. In many coal ash content, coal-fired furnace to control the furnace exit gas temperature typically of 1050 ~ 1100 ℃. The fuel oil furnace because very little ash, furnace slag is not dangerous, do not consider the problem of slagging furnace slag discharge outlet pipe, so the furnace exit gas temperature can be higher. For the above two reasons, the volume of the thermal load is higher than Pulverized fuel boiler. Pulverized volumetric heat load is about 145 ~ 185kw / m3, and the volumetric fuel burner heat load of up to 255 ~ 350kw / m3, so the same volume of the furnace fuel burner furnace capacity is relatively small pulverized coal fired. Rinse water gauge oil-fired boiler

If you know a little about chemistry, you may know that the sulfur content of oil and coal is roughly equal, but ask what low-temperature corrosion of oil-fired boilers is much more serious than coal-fired boilers, for two main reasons:

1. 90% of ash in coal-fired boiler, especially coal powder furnace, is taken away by flue gas, sulphuric acid steam formed in flue gas is absorbed by fly ash in flue gas, so that sulfuric acid vapor in flue gas is reduced, and about half of sulfur remains in ash when coal is burned. When the oil is burning, the sulfur content in the fuel almost all changes to the ash in the SO2, fuel, the fly ash in the flue gas is very little, and the adsorption ability to the sulphuric acid vapor in the flue gas is very weak.

2. The hydrogen content of oil in the oil-fired boiler is about 11%-12%. The combustion of each ton of fuel oil can produce about 1 ton of water vapor, and the partial pressure of steam in the flue gas is higher than that in the case of coal-burning.

Determine the location of the steam boiler room siting what issues need attention 1, boiler room refers to the building design boiler and ancillary equipment, water treatment facilities, pumps and sub-steam (water) tank and the like. Boiler should be separate and independent from other buildings. Boiler room should not be set directly in crowded places (such as public bathrooms, classrooms, restaurants, auditoriums, shopping malls, waiting rooms, etc.), or at the top, bottom, or the immediate neighborhood of the main evacuation port on both sides. 2, the new boiler room should not be connected to the house. 3, provided in the boiler room such as a semi basement layers or high buildings or the first layer must meet the following conditions: (1) each steam boiler rated evaporation does not exceed 10t / h, steam pressure does not exceed the rated 1.6MPa; rated each hot sale water boiler (including direct fired absorption chiller-room unit) does not exceed the output 7MW, the rated water temperature ≤95 ℃. (2) Each steam boiler must have a reliable overpressure protection interlocking means interlock protection device and the low water level. (3) accessories and safety interlock protection device for each boiler to regular maintenance and testing to ensure that sensitive and reliable. (4) the building structure between the boiler should have the appropriate proof Measures. (5) operate independently of the fireman who must hold the appropriate level of operating permits fireman, boiler and continuous operation of the same class more than five years, has not been an accident. (6) There must be safe evacuation routes. 4, should not be located in the boiler room or a high-rise multi-story building basement, an intermediate floor or roof, but the conditions required setting time, shall meet the requirements of paragraph 3, the first gist of the present, should meet the following conditions, and former boiler room should be set prior consent districts of the city and over special equipment safety supervision agency: (1) steam boilers rated evaporation each no more than 4t / h, rated steam pressure does not exceed 1.6MPa; each heat rated water boiler (including direct fired absorption chiller-room unit) does not exceed the output of 2.8MW, the rated water temperature ≤95 ℃. (2) must be light oil, city gas, natural gas as fuel or electric heating boiler. Underground boiler room non LPG gaseous fuel or a density greater than 0.75. Connection (3) using a fuel supply pipe welding backing. In addition, when set in the basement boiler room, blowdown or appropriate measures should be set up sewage. When using gas as fuel, the exhaust system is also provided accident. 5, not connected to the boiler room A, (B) and (C) a liquid combustible fire risk room. If connected to other production plants, application firewall separated. Waste heat boiler is not so limited. Boiler production plant belongs to class D, between the fuel tank, between the pump delivery room Class C production, between the gas regulator belonging to the delivery room A of production. 6, between the outer wall or roof of the boiler should be at least equivalent to 10% of the area between the boiler pressure relief area (such as windows, skylights, shutters, etc.), and the relief port should avoid crowded places. 7, boiler room should be equipped with emergency lighting and evacuation signs, emergency lighting voltage shall not exceed 36V.

Recently, Yuhang District, Hangzhou, Zhejiang Province, a printing company 20 steam tons / hour of coal-fired boilers have been stalled, this is the last Yuhang district an industrial coal-fired boilers, which marks the shutting down of Yuhang District of industrial enterprises to bid farewell to coal energy structure of coal turned to natural gas and other clean energy, Yuhang District from entering the industrial coal-free era.

Yuhang District "coal-free zone" construction of road resistance and long. As a major industrial zone, a long time, Yuhang District to focus on coal-fired thermal power plants, coal-fired boilers and other industrial enterprises formed a coal-dominated energy consumption structure. In 2014, the maximum amount of coal Yuhang District reached 783,600 tons. Large coal consumption that emissions of sulfur dioxide, dust and the like remain high for many years.

In order to further deepen the air pollution control, to win the Battle of the blue sky, Yuhang District, from 2017, will gradually tangqi thermoelectric, thermoelectric and sea Chongxian three coal-fired thermoelectric power plant with all closed down, the sea of ​​clean natural gas for thermoelectric realized heat. 3 thermal power plant shut down so that the region's coal consumption, pollutant emissions and other indicators to achieve substantial reductions in road construction of "coal-free zone" has taken a crucial step.

Yuhang bid farewell to coal road this did not stop. While coal-fired thermoelectric accounted for the bulk of coal consumption and pollution emissions, but only out of coal-fired power plant is not enough. 2018, the government decided to promote taking advantage of Yuhang District, the region within the remaining four coal-fired industrial enterprises (Coal Products) pot (kiln) furnace closed down or eliminated or modified.

Yuhang District to increase the proportion of electricity consumption, and actively guide the region's energy unit of coal to electricity, oil to electricity, gas bottle to electricity, the construction of an orderly distribution grid, promoting smart grid construction; continue to improve the level of utilization of natural gas, and urban area in addition to all the town cormorant birds, Baizhang full realization of natural gas supply, a total of 850 kilometers of natural gas pipeline construction and municipal gas transformation 45000; to promote the application of photovoltaic power generation, the region's industrial and commercial enterprises amounted to 173 megawatts of photovoltaic capacity building distributed, clean energy applications has taken shape in Yuhang District.

According to statistics, "Thirteen Five Year Plan" (2016-2020) since the implementation of environmental statistics included in Yuhang district industrial enterprises coal consumption from 588,900 tons in 2016 down to 38,900 tons in 2018, to drop in early 2019 0.

A substantial decline in coal consumption is brought to slash emissions of pollutants and air quality improved significantly. 2018, the main pollutant urban air Linping PM2.5 average concentration of 38 micrograms / cubic meter, decreased 40% in 2015. Region sulfur dioxide emissions of 7,833 tons in 2014 to 2018 had dropped more than 90%; NOx emissions to 8490 tons in 2014 to 2018 had dropped more than 60%.

Free Chat

About Us

Contact Us