Greenhouse Oil Boiler Prices

Greenhouse Oil Boiler Prices

How to prevent running back pass secondary combustion 1, 30% of the rated greenhouse boiler prices to deal with the amount of purge air before boiler ignition; the boiler must be 30% of rated air flow purge less than 5 minutes after the boiler fire, or allowed to boiler re-ignition. 2, fine-tuning the boiler and combustion systems pulverizing system operating conditions, to prevent incomplete combustion of oil and coal accumulating on the tail heating surface or flue. 3, boiler burning oil, adjust the proper air flow, fuel flow, confirming good gun oil spray, burning completely. If you find a bad oil spray gun should be discontinued immediately, and clean up. 4, when the oil application group administered powder, cast powder should be confirmed before the oil burner ignition good, or allowed to cast powder. 5, the oil powder boiler during cofiring, and check the fuel oil gun system of fire reinforcement. 6, normal operation, operation personnel in monitoring the economizer, an air preheater flue tobacco in different conditions of temperature, abnormal, should be checked to detect a fire-place. 7, air preheater sootblowing steam system normally put into operation, the soot-blowing pressure and temperature in a predetermined range. When the unit load or less prolonged 300MW kerosene mixed combustion, air preheater sootblowing steam to be continuous. 8, the air preheater into a reliable fire alarm device. 9, an air preheater inlet and outlet fume / air damper, and should be able to put an electric shutter can be open, closed tight. 10, if found preheater stall, should be put into operation again immediately, if not turn back, they should be isolated.

Construction of gas steam greenhouse boiler prices steam requirements for the construction of a gas boiler requirements, gas steam boiler installation for the construction of the boiler room have certain requirements, must comply with national requirements in the construction process. Gas and steam 1, the construction of a gas steam boiler room requirements 1) boiler room must comply with the "boiler energy saving technical supervision and management regulations" and "industrial boiler room design specifications" requirement. Gas steam 2) boiler room should have sufficient light and good ventilation, have the necessary antifreeze measures. And boiler room should stay away from schools, housing and densely populated areas. 3) the position should be close to the boiler room heating equipment, in order to reduce head losses and heat loss from the hot oil piping circulating pump. 2, furnace heat carrier device is arranged in claim 1) the sump should be lower than the lowest position of the heat carrier furnace and heat system 1 m, in order to put the net organic heat boilers and systems, sump and furnace heat carrier spacing less than 5 m or separated by a partition wall. It should be fitted with a sump exhaust pipe, which exhaust pipe diameter should be large and specifications than the inflation tube. 2) position of the expansion tank should be higher than the other devices and the piping system, the system must be higher than the maximum bottom level 1.5 m. It should not be installed directly above any one boiler, organic heat carrier to prevent overflow cause a fire. 3) the sump vent pipe, expansion tank, should be connected to the outdoor safety. Can not be mounted on the vent pipe to the valve, to ensure that the tank, the expansion tank to atmosphere to ensure atmospheric pressure operation. 4) the high volume of the expansion tank should be greater than 1.3 times and all the organic heat carrier furnace heat the entire heating systems is at the operating temperature is increased due to thermal expansion of volume. 5) low volume tank furnace heat carrier to be less than 1.2 times the total amount of organic heat. 6) hot oil circulation pump should be at least four weeks for 0.5 m space, and the inspection to ensure the installation routine, the need for maintenance.

After the project identification, party fast technical staff soon made contact with our company, to our installation, commissioning, to ensure the look normal, stable use during greenhouse boiler prices operation. Thanks fast boiler professional technical support and good service, I provide a lot of help for the textile dyeing and finishing production company. --customer feedback

Burner output should match the rated output of the greenhouse boiler prices, choose a good shape of the flame, such as length and diameter so as to adapt the furnace structure. The required combustion air is supplied from the root flare fuel gas and air or oil mist uniformly mixed rapidly, to ensure complete combustion.

Free Chat

About Us

Contact Us