Delicate Processing Electric Steam Boiler Dealer

Delicate Processing Electric Steam Boiler Dealer

Work and family considerations boiler shutdown boiler inspection carried out maintenance before restarting operation, the need for a series of maintenance work, combined with the user experience and learning references, be aware of the following specific boiler maintenance work and family considerations. 1. Preparation (1) before the boiler before the boiler equipment maintenance inspection, as in normal shutdown program is stopped, slow cooling, water circulation and ventilation through the furnace, and gradually lowering the temperature of the boiler furnace. When the temperature dropped below 80 ℃, the door opening open various checks on the boiler. Prevent steam, hot water or cigarette burns when opening the door opening. (2) Steam test boiler feed water, should be separated from the sewer line with the respective other operation of the boiler. Blind for a separator plate should be sufficiently strong to avoid high pressure medium in the broken drum is operated. This clearly indicated the blocking position. Combustion chamber and the flue (3) Check the boiler should be separated from other operation of the boiler. Flue and ventilation doors must be closed tight after separating. 2, preparation of the pressure vessel (1) before the container inspection prior to examination, to be completely cut off the connection tube between the container and the gas pressure or other equipment, particularly equipment using flammable or toxic media. Not only must the valve is closed, and must be sealed with blind plates, so that the valve leaks, resulting in leakage of flammable or toxic gases into the vessel, fire, explosion or poisoning. (2) all media in the container to be discharged. Containers containing flammable, toxic or suffocating medium should be cleaned, replaced or sterilized, by sampling and analysis. A power supply associated with the container, such as a container with a stirrer, reversing mechanism, etc., must be cut off, and a clear flag indicating not allowed to connect. 3, a boiler maintenance considerations are (1) Note ventilation and monitored prior to entering the drum, the container, the drum must be opened, all in the hole hand hole in the container and the collection tank, the air convection period and adequate ventilation. When entering the drum and the container inspection, one must monitor the external device. Before entering the combustion chamber or flue must also be ventilated. (2) Note that the detection of electrical safety in wet flue drum and when the lighting voltage should not exceed 24 volts, with electric lighting. In dry flue, using appropriate security measures, it may be no more than 36 volts lighting voltage. When entering the test vessel, should be used no more than a low-pressure proof lamp voltage 12V or 24V. When the supply voltage detection equipment and maintenance tools than 36V, good insulation must be reliable grounding cord. Boilers and containers should not be used flame. (3) removably connecting member pressing the forbidden band in the inspection of boilers and pressure vessels, pressure if the fastener member needs to unload or screwing, must fully release the pressure, before it can be. Bolts or other fasteners can not be tightened or unloaded at the boiler pressure, in order to prevent accidents. (4) prohibits self-test instead of the hydraulic pressure to the boiler pressure vessel test pressure test generally use water as the pressure medium, there is no gas as a pressure medium, otherwise it is very dangerous. For structural reasons the like, water can not be used as a pressure medium test individual containers, when instead of hydraulic pressure in accordance with design requirements, should be thoroughly checked before the test, check the strength and reliability of the measures taken. Prior to implementation should conscientiously implement the design in accordance with the provisions of, and prior consent of the security sector.

How much is the current mill electric heating steam boiler, steam boilers lot of mills are used more gas as the main form, but still in some places gas resources is not very good, so you need to take power as a medium. Textile mills in the procurement of electric heating steam boiler is also to go through the full contrast, in this case, I will choose to compare their own boiler plant products. Recently, there is a textile mill to be fast boiler consulting, want to buy steam boilers, currently determine the form of electricity, but still want to boiler manufacturers here to help account for the price, and fast boiler technician for the textile mill after a detailed understanding of the situation, out of accounting data show that the mill electric heating steam boiler with two 2t on it. Currently, the types of boilers in the fast side of the price of 180,000, and that the total purchase cost is around 36 million. Therefore, the textile company for electric heating steam boiler is how much money has been detailed understanding.

PM2.5 is frequently mentioned in recent years, and its main premise was that the formation of NOx, according to the latest research results show in Beijing, PM2.5 and NOx emissions due to the formation of more than 50% of the total proportion of PM2.5. Because of a large area of ​​coal to gas projects in recent years, the country's use of gas-fired boiler more than 50 million units in the Beijing area, gas boiler emissions will soon exceed the vehicle, as the primary sources of NOx in Beijing, so Beijing EPA first proposed the strict NOx emission standards: Beijing new boiler to perform emission limit of 30 mg / standard cubic meter for boilers with high-pollution fuel combustion zone ban, the implementation of emission limit 80 mg / standard cubic meter . The standard is much higher than the European emission standards for boilers, to the world's most demanding emissions standards in Southern California to move closer to the boiler.

Steam boiler is too many forms, take an ordinary fast-packed 4-ton steam boiler. Water is heated into steam in the drum and heat is emitted by fire in the furnace, which is the principle of the steam boiler. Say the boiler first the pot. The boiler is a drum boiler with water cooling. Two return pyrotechnic tubes are arranged in the left and right parts of the drum, and the front cigarette box in the front part of the drum is turned back. Between the drum and the bottom box, there is a drop tube and a water-cooled tube, forming the frame of the combustion chamber. There is a steam separator on the top of the drum to reduce the water produced by steam. The heating surface of the boiler is the lower part of the drum, water-cooled pipe and pyrotechnic pipe. The combustion part consists of a chain grate and a drive device, Add the boiler frame on the grate of the composition of the combustion chamber composition. Surrounded by refractories. Coal from coal hopper, there are coal gate to control the thickness of coal seam while sealing the front of the air. The lower part of the combustion chamber is the place where the blast enters, and this kind of boiler has great resistance and needs forced blast. Cinder, discharged from the back of the grate through hawk iron and sent out of the furnace by the slag extractor. From the back of the boiler, the flue gas goes forward from the first return pipe of the boiler, the second return pipe returns to the rear part of the boiler, and then goes into the dust collector to separate the ash, and then through the draught fan, it is discharged from the chimney. The induced draft fan is not only the exhaust gas, but also necessary for the negative pressure operation of the boiler. Steam boiler is pressure capacity Device, safety device is necessary. Essential water level gauges, pressure gauges, safety valves, thermometers, electric pumps that can replenish water under pressure, and steam pumps that can also be used in the event of power outages. Boiler water must be softened and water treatment equipment.

Free Chat

About Us

Contact Us