5Ton Diesel Boiler For Fabric Dyeing

5Ton Diesel Boiler For Fabric Dyeing

So the design rate of energy and energy efficiency is closely related to the gas 5ton diesel boiler for fabric dyeing, Moreover, manufacturers also need to have a good product configuration, so-called boiler, in fact, important is that it's internal configuration, if the quality of a burner on the boiler inadequate nature will be allowed in the use of difficult high energy efficiency. Now the production of boilers generally are also multi-link mode, that is, manufacturers often produce only a body, the other parts are configured to be provided by upstream suppliers, if a manufacturer is not well upstream suppliers, want let it have a good energy saving is very difficult.

The reason why different 5ton diesel boiler for fabric dyeing manufacturers are different in boiler prices is that different manufacturers must be different in terms of their own actual situation, production process, materials used and design, and so on. When these factors or aspects are different, then there must be different boiler prices.

The inspection requirements for 5ton diesel boiler for fabric dyeing welded joints are made on the basis of listening to the opinions of the relevant units and referring to the regulations of the relevant codes. This code does not require gas-phase furnace and liquid-phase furnace respectively, but different requirements according to different pressure components. 1. The longitudinal ring weld seam of the boiler drum and the joint of the head of the boiler shall be ray or ultrasound plus at least 25% ray detection, which is basically consistent with the requirements of the current steam boiler and hot water boiler code, Only the requirement for ultrasonic plus at least 25% x-ray flaw detection has been added, the same as the 80 version steam boiler code requirements. This provision mainly considers ultrasound plus 25% X-ray detection, complete The defects in the weld can be detected to meet the safety requirements, and the production cost can be reduced. 25% X-ray inspection must include the longitudinal seam and the circumferential cross joint. 2. The inspection of the butt joint of the heating surface pipe is required according to the different heat condition. Heat is different from radiative heat and convective heat. In the draft for advice, 25% and 10% spot tests are prescribed respectively. Among the feedback, some thought the requirement was lower, and suggested that it should be changed to 50%; some thought the requirement could be lower. Through analysis and research, we have adopted the latter opinion that the radiation range is no less than 10%. X-ray inspection; convective section not less than 5% X-ray detection. Gas shielded welding should be adopted in butt weld of heated surface pipe, and the quality can be guaranteed. In addition, the method of flaw detection and the calculation of sampling rate are stipulated in this regulation, which makes this procedure more operational. 3. Except for the drum of the gas furnace, the boiler drum of the liquid phase furnace, the heating surface pipe of all organic heat carrier furnaces and the butt joint of the pipe shall not be required to carry out the mechanical performance test. Therefore, this regulation only for gas boiler drum batch production of each 10 to do a test plate. There is no requirement for a test board in any other case. . The use pressure of liquid phase furnace is relatively low. At the same time, not only the welding method is specified clearly in this code, but also the requirements for welding procedure evaluation are put forward, which can guarantee the quality and performance of welding seam.

The United States is our national enterprise, one of the world's top 500, with very bright glory on the world stage. US air-conditioning as a subsidiary branch, with a very large market competitiveness. 2016, Hubei US air-conditioning due to market demand to expand production lines, need to purchase steam 5ton diesel boiler for fabric dyeing to provide energy support for the new production line. After the boiler industry for a number of enterprises contrast, is determined to cooperate with the fast boiler, buy a whole 10 tons of steam condensing gas steam boiler (WNS10-1.25-Y.Q).

Free Chat

About Us

Contact Us